FESCO provides project transportation of oversized and heavy cargo from receiving it at the manufacturing facility to installing the transported structures at the destination point.
About the service
FESCO organizes shipments for a variety of industries, provides customs support of each project, and follows all the requirements of the oversized cargo transportation at border crossing points and along the entire route.
-
Transportation of cargo of various measurements
-
Delivery across the world
-
Accredited specialists
Project preparation
01
Concept and route development for each project
02
Route description and analysis considering possible restrictions and their handling
03
Determining the number of vehicles required for the project completion
04
Detailed description of all cargo handling operations throughout the route
05
Cargo insurance operations
06
Transportation documents
07
Transportation costs and customs duties payments orders
08
Preparation of customs processing documents
Project logistics
-
Construction and engineering services for cargo transportation projects
- Engineering, geodesic, and geological surveys
- Design and organizations of the project including preparation of necessary documents
- Renovation and construction of project facilities
-
Oversized cargo transshipment
- Tandem crane lifting management
- Use of hydraulic systems for horizontal and vertical movement of heavy loads
- Heavy cargo handling using special equipment
- Loading of oversized cargo on barges and special railcars
-
Oversized cargo transportation using special vehicles
- Development of a loading, fastening and safe transportation plan
- Obtaining permits for heavy cargo transportation throughout EU countries
-
Oversized equipment transportation by railway
- Development of a loading, fastening and safe transportation plan
- Route coordination
-
Oversized and heavy cargo delivery by water
- Obtaining permits
- Designing loading and fastening plan
- Towing
- Navigation throughout any region
- Ro-Ro delivery (even to unequipped shore)
- Urgent transportation cases such as cargo delivery after the end of the navigation period and gateway opening
-
Customs support to projects
- Preparing necessary documents
- Coordinating and opening temporary customs control zones
- Customs clearance of project cargo
- Obtaining permits conducting special customs procedures
- Separation and identification of mixed cargo at its shipment point
Cases
Delivery of steam generators of Akkuyu NPP
-
- Customer
- Akkuyu NPP
-
- Period
- 2020
Job
- Four steam generators weighing 365 tons each (net weight without packaging - 355 tons) intended for power unit No.1 were received at marine terminal Vostochny.
- Dispatch of equipment started on August 22, 2020 in Volgodonsk at the Atommash plant (a branch of JSC AEM-Technologies, part of the engineering division of Rosatom - Atomenergomash). Steam generators manufactured for the first nuclear power plant in Turkey were transported in closed holds.
- To unload steam generators from the vessel a large Liebherr LR 1800 crawler crane was assembled at the NPP site. Steam generators supplied for construction of the Akkuyu NPP were unloaded from the vessel to the heavyweight storage area, where the equipment and all its components will have to pass entrance control.
- Steam generators are the main equipment of primary circuit of the reactor. The Akkuyu NPP project includes four power units with VVER-1200 generation 3+ reactors, each unit will be equipped with four steam generators.
- A steam generator is a first-class safety equipment. It is a horizontal cylindrical vessel with two elliptical bottoms. In the middle part there are collectors for supply and removal of coolant: at the Akkuyu NPP the coolant is chemically desalinated water. In the upper part of it there is a space where steam is formed, and in the lower part there is a heat exchange surface, which consists of 11 000 stainless pipes. If you add up the length of all the tubes of one steam generator, their total length will be 148.5 km. The diameter of pipes is 16 mm, the length is from 11 to 17 meters. The ends of pipes are fixed in two collectors. The length of the device is about 15 meters, the diameter is more than 4 m.
- Steam generators are installed after the erection of columns, installation of embedded items and supports, these works precede the start of welding of the main circulation pipeline.










FESCO provided transportation and installation of power equipment for the Yerevan CHP plant
-
- Customer
- Yerevan CHP plant
-
- Period
- 2020
Job
- FESCO Transportation Group provided transportation and installation of power equipment for the Yerevan CHP plant. Cargo with a total weight of 14.5 thousand freight tons was delivered from Georgia to Armenia by rail and road transport.
- Large-sized heavy equipment: a gas turbine weighing 205 tons, a transformer (182 tons) and a gas turbine generator (169 tons) were dispatched from port Poti (Georgia) and sent to Yerevan by rail on a six-axle conveyor.
- The rest of the cargo — a steam turbine generator (148 tons), a condenser (85 tons) as well as general cargo was delivered to construction site by motor transport. Special transportation permits were obtained for this purpose.
- The uniqueness of the operation was that it was carried out in conditions of military operations and restrictions due to the pandemic. In addition, FESCO specialists provided installation of five units of delivered power equipment with Lift System 44A portal systems with a lifting capacity of up to 400 tons and Hydrospex Cylap HSL2000 with a lifting capacity of up to 800 tons.
- FESCO has extensive experience in transporting heavy and oversized cargo, including equipment for the construction of nuclear power plants in different countries. In 2020, the Group organized delivery for the Ruppur NPP in Bangladesh and the Akkuyu NPP in Turkey.
- Increasing the portfolio of contracts with major customers as well as expanding presence in the market of large-tonnage and oversized cargo transportations are priority directions of business development of FESCO.









Ruppur NPP Construction Project, Bangladesh
-
- Customer
- Atomstroyexport JSC
-
- Period
- August 2018 – till present
Job
- Multimodal transportation of equipment from port St. Petersburg to construction site of the Ruppur NPP in the Republic of Bangladesh.






Delivery of the reactor pressure vessel to Ruppur NPP, Bangladesh.
-
- Customer
- Ruppur NPP
-
- Period
- 2020
Job
- The FESCO Projects team delivered the next batch of equipment to Ruppur NPP, Bangladesh. Sets of basic equipment arrived on motor vessel Daisy from Novorossiysk to port Mongla: a reactor pressure vessel, a steam generator, a polar crane. Large-sized heavy equipment was reloaded to barges, which will then proceed to berth of Ruppur NPP. There the equipment will be reloaded onto motor transport by a 600-ton crane for further delivery to the place of storage.
- Total tonnage: 2363 tons, 8184 freight tons;
- Reactor pressure vessel 347.2 tons;
- Steam generator 333.755 tons;
- Length of beams of the polar crane is 41.83 meters.




Transportation of Siemens equipment, St. Petersburg – Nizhnekamsk
-
- Customer
- ENKA / ENTRADE
-
- Period
- March – November 2019
Job
- Transshipment of Siemens equipment in port Bronka, St. Petersburg
- From the port some of the equipment was delivered to Nizhnekamsk by specialized motor transport and some by barges. Transshipment of equipment from an ocean vessel to a barge using ship cranes
- Transshipment of equipment delivered by barge to the Transkama terminal, Nizhnekamsk using cranes for further transportation by specialized motor transport to the place of operation.



Kudankulam NPP Construction Project, India
-
- Customer
- Atomstroyexport JSC
-
- Period
- May 2019 – till present
Job
- Multimodal transportation of 4 sets of steam generators, collectors and related equipment from the AEM Technologies workshop in Volgodonsk to port Bolshoi in St. Petersburg.

Amur Oil Refinery
-
- Customer
- Sinotrans Ltd. Energy Logistics Branch
-
- Period
- January 2019 – till present
Job
- Delivery of pipes from port Busan to Russian Far Eastern ports Zarubino and Nakhodka by bulk vessels
- Loading into gondola cars and delivery by rail to the place of operation of AGPP (Svobodny district, Amur region, Russia)
- Unloading from gondola cars to trucks and delivery to the warehouse.




Construction of a Metafrax methanol production plant , Gubakha, Perm Territory
-
- Customer
- FAGIOLI S.p.A., Italy
-
- Period
- April – August 2019
Job
- Development of a loading and fastening plan
- Automobile transportation of a 25-meter reactor from Italy to a construction site in Gubakha, including customs formalities
- Barge transportation of oversized equipment (separator/condenser) from the port of Constanta to Gubakha. Registration of transit formalities
- Crane unloading > transportation to the construction site on modular semi-trailers

Transportation of main equipment for the construction of Nizhnekamsk CHP plant
-
- Customer
- ENKA İnşaat ve Sanayi A.Ş.
-
- Period
- May 2019 – till present
Job
- Transshipment of cargo in port Bronka
- Delivery by inland waterways to Transkama terminal
- Organization of unloading from a barge-towing train to specialized motor vehicles
- Delivery of equipment to construction site in Nizhnekamsk.



Transportation of Liebherr gantry cranes, Saint Petersburg - Nakhodka
-
- Customer
- Global Ports LLC
-
- Period
- August – October 2019
Job
- Loading and preservation of 4 Liebherr cranes in terminal Petrolesport, St. Petersburg. The weight of one unit is 116.96 tons.
- Transportation and unloading in terminal of Vostochnaya Stevedoring Company LLC, port Vostochny, Nakhodka.

Transportation of nuclear reactor blocks, Petropavlovsk-Kamchatsky - Primorsky Territory
-
- Customer
- ROSATOM State Corporation, FSUE RosRAO, Russia
-
- Period
- August – September 2019
Job
- Loading project development
- Loading of equipment using tugs on a semi-submersible vessel in Petropavlovsk-Kamchatsky and subsequent transportation to the place of unloading in Primorsky Territory.





Cargo transportation for HAVAL automobile plant
-
- Customer
- Haval Motor Manufacturing Rus
-
- Period
- September 2017 – August 2018
Job
- Transportation of large-tonnage and oversized cargo from Shanghai, China to Tula region (Novomoskovsk) for the HAVAL automobile plant under construction (Great Wall)
- Delivery of more than 1100 containers from Shanghai/Tianjin via Vladivostok and Mongolia to the Tula region
- Delivery by the "Last Mile" and unloading of equipment at the construction site.

Transportation of steam superheaters, Podolsk - Armenian NPP (Metsamor, Armenia)
-
- Customer
- ZIO-Podolsk JSC
-
- Period
- April – July 2018
Job
- Order of railway transporters, type 3925, 3928
- Obtaining permits and approvals along the route from Russian Railways
- Customs transit clearance
- Ferry railway crossing from port Kavkaz to port Poti
- Railway transportation to the Armenian NPP.



Transportation of equipment for construction of the Kola Shipyard, Belokamenka village, Murmansk region
-
- Customer
- CCCC, China Communications Construction Company (China)
-
- Period
- May – July 2018
Job
- Transportation of cranes anf drilling rigs on route Shanghai, China — port Murmansk
- Transshipment of cargo in port Murmansk to barge-tow trains and river freight to Belokamenka
- Unloading in Belokamenka and motor transportation to construction site of the Kola shipyard. The maximum weight of a unit of cargo in a batch is 78 tons.



Transportation of transformers
-
- Customer
- Mosenergo (CHP 21 and CHP 25)
-
- Period
- February – March 2018
Job
- Transshipment in port Novorossiysk
- Transportation by heavy-duty rail transporters 3925 and 3928 to Moscow
- Transshipment to trawls, delivery to site in Moscow
- Customs clearance in port Novorossiysk.






Transportation of power equipment
-
- Customer
- Krasnoyarsk Construction Center
-
- Period
- January – February 2018
Job
- Transportation on route Mertingen, Germany — Ust-Ilimsk, Russia
- Transshipment in port Bronka, motor transportation to Ust-Ilimsk at extremely low temperatures (-38 C°)
- Delivery of related general cargo from Germany by road - 21 trucks.

Taman Terminal.OTEKO
-
- Customer
- Zuest & Bachmeier Project GmbH
-
- Period
- 2017–2018
Job
- Freight forwarding services
- Transshipment of a technological complex for unloading coal in port Novorossiysk, Burgas or Constanta on river-sea class vessels and cars
- Cargo delivery in customs transit to the site of the construction terminal in Taman.




Freight forwarding services
-
- Customer
- CRCC (China Railway Construction Company)
-
- Period
- July – October 2017
Job
- Transportation of five tunneling shields and their components (total volume 10600 m³, weight 3250 tons) for the Moscow Metro from port Shanghai, China to port Bronka, St. Petersburg, Russia. The weight of each shield assembled is 650 tons, parts of the shield weighing from 10 to 138 tons.
- Customs clearance in port Bronka
- The cargo was delivered from St. Petersburg to Moscow by river and motor transport.

Freight forwarding services
-
- Customer
- YAMAL LNG
-
- Period
- June – July 2017
Job
- Transportation of factory equipment under the YAMAL LNG project from port Rostock and port Kaliningrad to port Sabetta. The total weight of the cargo is 1 474 tons, the volume is 30 769 m³ (including the main platform weighing 600 tons, a vertical pipeline rack weighing 320 tons, the main staircase weighing 125 tons, a mezzanine weighing 63 tons).

Freight forwarding services
-
- Customer
- PJSC Power Machines
-
- Period
- August – Sepetember 2017
Job
- Transportation of two hydraulic turbine impellers from St. Petersburg to the Krasnoyarsk HPP along the Northern Sea Route. The length of the route is 6000 km. Weight of each wheel is 245 tons, diameter is 8.65 m, height is 4 m. Auxiliary equipment weighing 160 tons.



Freight forwarding services
-
- Customer
- Afipsky Oil Refinery
-
- Period
- 2017–2018
Job
- Transportation of the hydrocracking complex of the Afipsky Oil Refinery. 10 cargo shipments. Maximum weight of each unit is 743 tons, diameter is 5.5 meters, length is 54 meters. The total weight of all cargo is 19 000 tons. Transportation by sea from port Constanta to port Novorossiysk, delivery from port Novorossiysk to the construction site of Afipsky Oil Refinery.


Freight forwarding services
-
- Customer
- Gazprom Dobycha Shelf Yuzhno-Sakhalinsk LLC
-
- Period
- July – August 2017
Job
- Transportation of equipment containing radioactive source IM07 for the needs of Kirinsky Gas Station by crane vessel from Aberdeen, Great Britain to Kholmsk, Sakhalin via the Northern Sea Route with icebreaker escort.

Freight forwarding services
-
- Customer
- PJSC Power Machines
-
- Period
- March – July 2017
Job
- Transportation of equipment for construction of CHP plants (coal mills with a total weight of 444 tons and a volume of 1 426 m³) from Duisburg and Wetter, Germany and Izmir, Turkey to port Ho Chi Minh, Vietnam for the construction project of the Long Fu CHP plant.

Freight forwarding services
-
- Customer
- Fagioli S.p.A
-
- Period
- April – June 2017
Job
- Transportation of special equipment (cast roll weighing 233 tons, dimensions 11 286 x 2 610 x 2 725 m) from Novorossiysk to Magnitogorsk by rail.

Freight forwarding services
-
- Customer
- Zvezda – Rosneft Oil Company
-
- Period
- August – September 2016
Job
- Delivery of five cranes weighing from 100 to 320 tons each from China to the Bolshoy Kamen Bay by a specialized vessel, including ship agency and fastening services.

Freight forwarding services
-
- Customer
- Ministry of Defense of the Russian Federation
-
- Period
- July – August 2016
Job
- Transportation of 9 000 freight tons of equipment and construction materials from Arkhangelsk to facilities under construction on the island of Wrangel and M. Otto Schmidt (Chukchi Sea)
- Processing of ship's lot in port Arkhangelsk and unloading on the roadstead with delivery to the shoreline of places of unloading places.

Download
Submit request
Type all fields of form, we will contact you soon
Contacts
Other services
FESCO uses cookies developed by our specialists and third parties to analyze the website traffic and to improve our services and interaction with users. By continuing to browse the site, you are agreeing to our use of cookies. You will find more detailed information in our Privacy Policy
Get consultation